Drilling at Golden Cup intersects high grade gold up to 14.3g/t Au

High grade gold mineralisation intersected in recent Golden Cup drilling program

  • 7.0m @ 4.6 g/t Au from 61m down-hole inc. 2.0m @ 14.3 g/t Au from 61m down- hole (GCRC093)
  • GCRC094 intercepted 6.0m @ 7.4 g/t Au from 67m down-hole inc. 3.0m @ 11.3 g/t Au from 68m down-hole (GCRC094)
  • GCRC084 intercepted 10.0m @ 2.1 g/t Au from 45m down-hole inc. 2.0m @ 5.4 g/t Au 48m down-hole (GCRC084)
  • Total of 11 holes for 1,022m, were consistently mineralised from 35m (see Table 1) GNM is reviewing the drill results and is planing a follow up drilling program to takeplace in 2023

View full ASX announcement here

Previous Post
Brisbane Mining Conference presentation
Next Post
Noosa Mining Investor Conference presentation