The finalisation of our first program at Camel Creek for 2021 and these latest one metre assay results have returned some of the best and most significant assay results ever seen at Camel Creek. We look forward to the next program, designed to test and extend the high grade and strike extensive gold mineralised zones highlighted. Drilling is due to commence by the end of July 2021 and will be targeted on further deep testing of the Camel Creek gold system, particularly in the Hinge Zone target area.
- One Metre assay results at the Camel Creek Gold Project include:
o 58m@5.86g/tAu(CCRC50)from155metresincluding18m@14.09g/tAu o and1m@153.89g/tAufrom191metres
o 22m@7.38g/tAu(CCRC54)from154metresincluding15m@10.43g/tAu o 32m@2.62g/tAu(CCRC51)from164metresincluding7m@5.79g/tAu
o 34m@2.52g/tAu(CCRC52)from126metres
o 61m@1.62g/tAu(CCRC63)from167metresincluding35m@1.95g/tAu o 9m@2.66g/tAu(CCRC72)from52metres
o 29m@2.77g/tAu(CCRC73)from78metresincluding16m@4.03g/tAu
o 8m@2.77g/tAu(CCRC76)from56metres
o 20m@1.79g/tAu(CCRC77)from95metres
o 14m@1.76g/tAu(CCRC78)from57metres
Great Northern Minerals Limited held a Webinar on Thrusday, 17th June 2021 which included a presentation and discussion of the recent Camel Creek drilling results by Company’s Managing Director, Mr Cameron McLean and Technical Director and Geologist, Mr Simon Coxhell, followed by discussion and question time:
- Camel Creek setting and geology
- Drilling Program aims and outlook
- Strategy for Camel Creek
- Questions and Answers
View the complete Webinar overview of the Project and results here